Dispute ResolutionWeld Failures in a High Pressure High Temperature Hot Water Pipeline
Type of Project Outline of Project A senior member of Cadogan's staff was appointed as expert witness for the claimant. The work included visual inspections, radiography, metallurgical examination, liaison with an expert on fracture mechanics, design checking and assessment of operation and maintenance. The welds were diagnosed as failing from stress-corrosion cracking. The stress levels in the welds were so high as to render a normally benign environment corrosive. Reports were written and submitted and the case settled in favour of the claimant before trial. Cadogan Consultants was commissioned as Consulting Engineer for the replacement pipeline. key skills used by cadogan consultants
|